Second Production Meeting Scheduled
Our second production meeting is this evening, August 29, 2005 at 6:00 PM in the basement of the McGrath House in Heritage Square, Oxnard, CA. The meeting will last approximately 90 minutes and will have the following agenda:
- Introductions & Roles - Introduce anyone new, and reintroduce existing folk.
- Audition update (Jerry) - Assign staff to help when Liz is unavailable. Pass out scripts.
- Music update (Jerry) - Introduce accompanist (if attending). Ensure piano in Petit is in working order (tuned, functional). Arrange music recording (if possible). Arrange for music to anyone who needs to hear the show. Hand over music to accompanist.
- Costumes update (various) - Identify necessary costume components. Identify folks who can assist with costumes. Arrange for callback/readthrough measurements to be taken.
- Set update (Sean, Bob) - Show design for set. Arrange for building details. Set timelines.
- Props update (Jerry) - Identify necessary props. Assign folks to work on/obtain props.
- Review timelines & action items. Poll for best time and schedule next production meeting.
- Close meeting.
- Sean


0 Comments:
Post a Comment
<< Home